Description: Pilot project for biofuel Pascuales Terminal.
Year of delivery: 2009
Construction of one 40000 barrels API tank (TQ-35) with geodesic dome and floating internal roof. Catodic protection, grounding, fire fighting systems, piping and control valves.
Construction of two 5000 barrels API Tanks for ethanol (TQ-33 y TQ-34) with geodesic dome and floating internal roof. Catodic protection, grounding, fire fighting systems, piping and control valves.
Ethanol and Gasoline Pumps.
Mixer
Fire Fight System
Civil Works: Groung movement, concrete walls, tank foundations.
Descripción: Proyecto piloto para biocombustible Terminal Pascuales.
Año de finalización: 2009